Start with the finished space that must be filled. For a low rectangular area, measure length, width, and finished fill depth. For a circular hole, measure diameter and average depth. For complex depressions, divide the site into named sections rather than treating the entire boundary as one box.
The calculator's primary result is required finished fill volume. This is a geometric quantity in cubic feet, cubic yards, and cubic meters. It remains visible even when you later enter a loose-volume conversion, density, allowance, truck capacity, or price.
Fill Dirt Cubic Yard Calculator
Rectangle in feet with finished depth in inches
finished yd³ = length × width × depth ÷ 324A 20-by-10-foot low area filled 6 inches deep contains 100 cubic feet, or 3.703704 cubic yards. That is the space the finished fill occupies. It does not yet claim how much loose material a truck must deliver.
A circular hole uses π times radius squared times depth. Known-area mode accepts measured square footage, and known-volume mode converts an existing plan quantity without reconstructing geometry.
How Much Dirt to Fill a Hole?
Choose rectangle for a box-like excavation or circle for a round hole. Use an average measured depth when the bottom is reasonably uniform. If the hole has shelves, ramps, utilities, or obstructions, add separate sections and subtract exclusions where appropriate.
Subtracted sections must leave a positive net volume. This allows a measured obstruction to be removed from the gross fill calculation without allowing an impossible negative result. The copied estimate preserves each signed section subtotal.
Fill Dirt for Raising Grade
For a simple grade change that varies approximately evenly from one edge to another, use the varying-depth mode. It averages start and end depth, then multiplies by rectangular area. A 20-by-10-foot zone changing from 4 to 8 inches uses a 6-inch average and requires 3.703704 finished cubic yards.
This is an approximation, not topographic modeling. Complex grading, drainage, slopes, retaining systems, and engineered earthwork require appropriate survey and project methods. Multiple measured zones are safer than a two-point average when the surface changes irregularly.
Finished vs Loose Fill Dirt Volume
Earth material can occupy different volumes in bank, loose, and compacted states. The relationship depends on material and project conditions, so this calculator applies no default conversion. Its optional field uses one explicit convention: compacted fraction of loose volume.
Under that convention, loose required equals finished compacted volume divided by the entered fraction. If a project-specific value states that compacted volume is 80% of loose volume, a 10-yard finished requirement corresponds to 12.5 loose yards. This is a hypothetical user-entered factor, not a recommended default.
Ordinary planning allowance is applied separately after the loose conversion. With the same 10 finished yards, an entered 80% fraction, and a separately chosen 5% allowance, loose volume is 12.5 yards and planning quantity is 13.125 yards. Both assumptions remain visible.
Does Fill Dirt Compact?
Material volume can change when excavated, handled, placed, moisture-conditioned, and compacted. However, one universal “add 20%” rule is not defensible. Supplier information, project specifications, laboratory or field testing, and geotechnical requirements control when compaction matters.
Do not use allowance as a disguised compaction factor. Allowance addresses a user-selected purchasing margin; the compacted fraction defines a particular finished-to-loose volume relationship. Leaving both fields blank returns finished volume without adjustment.
Fill Dirt Cubic Yards to Tons
Weight requires density for the actual fill material and condition. Moisture, gradation, rock content, and composition matter. Enter supplier tons per cubic yard, pounds per cubic foot, pounds per cubic yard, or kilograms per cubic meter.
When a loose conversion is active, the displayed purchase weight uses the purchase-volume basis and the entered density. Confirm that the density refers to the same condition as the quoted volume. Otherwise, compare volume rather than combining mismatched states.
How Many Truckloads of Fill Dirt?
Enter the capacity stated by the supplier or applicable equipment information. Planning volume is divided by that capacity to show exact load equivalents and whole loads. A 25-yard purchase requirement divided by an entered 10-yard capacity is 2.5 equivalents, or 3 whole loads.
Actual payload may also be limited by material weight, truck configuration, access, and regulations. The calculator does not certify legal payload or assume one standard dump-truck size.
Fill Dirt Cost from Your Supplier Price
Cost uses only supplier values you enter. Price may be per cubic yard or, with density, per ton. Delivery is kept separate. No national price, local average, minimum load, tax, equipment fee, or placement charge is fabricated.
For example, an unadjusted 10-yard purchase at an entered $20 per yard equals $200. Adding an entered $100 delivery fee produces a $300 estimate. Update the quantity basis, price, and delivery whenever the supplier quote changes.
Fill Dirt vs Topsoil and General Dirt
Dirt Calculator handles broad dirt yardage without a fill-specific finished-to-loose workflow. Topsoil Calculator handles lawns, planting layers, coverage, and bag-versus-bulk purchasing. Cubic Yard Calculator owns material-neutral volume.
Fill dirt is not automatically suitable for every structural use. Foundations, road embankments, retaining systems, and engineered pads may require specified material, testing, lift thickness, moisture control, and verified compaction. This calculator estimates quantity only.
Worked Fill Dirt Examples
Rectangular low area
20 × 10 feet at 6 inches equals 3.703704 finished yd³.
Circular hole
A 10-foot diameter hole averaging 6 inches deep equals 1.454441 yd³.
Known area
500 ft² at 4 inches equals 6.172840 finished yd³.
Varying depth
A 20 × 10-foot area changing evenly from 4 to 8 inches averages 6 inches and equals 3.703704 yd³.
Subtracted exclusion
A 10 × 10-foot area at 3 inches minus a 2 × 2-foot obstruction at the same depth leaves 24 ft³.
Custom compacted fraction
Suppose project information defines compacted volume as 80% of loose volume. Ten finished yards then requires 12.5 loose yards before allowance.
Supplier density
Assume the supplier provides 1.2 tons/yd³ for the applicable state. Ten purchase yards estimates 12 US tons.
Truck and cost
Twenty-five purchase yards at an entered 10 yd³/load is 2.5 equivalents. At $20/yd³ plus $100 delivery, cost is $600.
Fill Dirt Calculator FAQ
How much fill dirt do I need?
Calculate the finished volume of the void or grade change first. Convert to loose purchasing volume only with a clearly defined project or supplier factor.
How do I calculate fill dirt in cubic yards?
Multiply fill area by finished depth to get cubic feet, then divide by 27.
How much dirt fills a hole?
Use the hole's rectangle or circle dimensions and average depth. Split irregular holes into measurable sections.
How many cubic feet are in a cubic yard?
Exactly 27 cubic feet equal one cubic yard.
Should I add extra dirt for compaction?
Do not use a universal percentage. Enter a project-specific loose-to-compacted convention when one is available, and keep ordinary allowance separate.
Is loose fill the same volume as compacted fill?
Usually not, but the relationship depends on the material, condition, and project. The calculator makes no conversion by default.
How many tons are in a cubic yard of fill dirt?
There is no universal answer. Enter the supplier's applicable density for the fill material and condition.
How many yards does a dump truck hold?
Capacity varies. Enter the actual supplier or equipment capacity rather than using a site-wide default.
How much does a yard of fill dirt cost?
Use the price from your supplier. This calculator contains no national or local default.
What is the difference between fill dirt and topsoil?
Fill dirt builds grade or fills voids; topsoil is a finished growing layer.
Can I use fill dirt under a foundation?
This calculator cannot certify suitability. Engineered or structural fill may require specified material, testing, and geotechnical oversight.
How do I calculate fill where depth changes?
For a simple linear change, average the start and end depths. Use measured sections or professional earthwork methods for complex terrain.
Methodology, Sources, and Safety Limits
The engine calculates finished geometric volume from measured shapes, known area, known volume, or a simple linear average depth. Named sections may add fill or subtract exclusions. Cubic feet convert to cubic yards using exactly 27 ft³ per yd³.
The optional compacted-fraction convention is defined directly beside its input and has no default. FHWA earthwork guidance and Penn State Center for Dirt and Gravel Road Studies materials guidance support distinguishing material states and using project-specific factors. Those sources do not establish one universal factor for every fill.
This calculator does not certify structural suitability, bearing capacity, achieved compaction, settlement, slope stability, retaining-wall backfill, foundation suitability, or drainage design. Project specifications and geotechnical requirements control engineered work.